Calliope Substation (Gladstone) – Powerlink & UGL Infrastructure

Industrial Electrics were contracted by UGL infrastructure to carry electrical works at the Caliiope Substation, which is supplied from the Gladstone power station. Industrial Electrics’ vast knowledge and well trained staff assisted immensely to meet the program deadline while achieving the expected high standard of installation. Industrial Electrics scope of works included:

  • Cable hauling
  • Earthing
  • Cable tray
  • Erection of disconnectors
  • Labelling and terminating of marshalling panels
  • VT's and CT's
  • Stringing of overhead lines
  • Installation of insulators and droppers.